There were 367 Supabase outages since March 2021. The 111 outages from the last 12 months are summarized below, with incident details, duration, and resolution information.

Major March 6, 2026

March 2026: Edge Functions experiencing high response times in ap-northeast-1 and ap-northeast-2

Detected Mar 6, 2026 9:26 AM EST · Resolved Mar 6, 2026 2:39 PM EST · Duration about 5 hours

Supabase Edge Functions experienced high response times in the ap-northeast-1 (Tokyo) and ap-northeast-2 (Seoul) regions for 5.2 hours. The incident affected Edge Functions performance in these Asia Pacific regions, causing service disruption for users. The issue was resolved through mitigation efforts that were first applied to Tokyo, then rolled out to Seoul, with both regions returning to normal operation.

Major March 4, 2026

March 2026: Supabase Dashboard and Management API inaccessible

Detected Mar 4, 2026 5:16 AM EST · Resolved Mar 4, 2026 8:00 AM EST · Duration about 3 hours

Supabase's Dashboard and Management API became inaccessible for 2.8 hours due to a problematic change that was later identified and reverted. Existing user projects remained unaffected and continued to function normally throughout the incident. The service was fully recovered and monitored before being marked as resolved.

Minor March 2, 2026

March 2026: Database issues in us-east-2

Detected Mar 2, 2026 9:10 PM EST · Resolved Mar 3, 2026 1:33 AM EST · Duration about 4 hours

Supabase experienced increased database operation errors in the us-east-2 region affecting a subset of projects for 4.4 hours. The incident impacted database functionality, with users able to manually resolve issues by restarting their projects through the dashboard. The root cause was addressed with most projects automatically fixed, though a handful required manual intervention from Supabase staff.

Major February 28, 2026

February 2026: Increased Edge Function Errors across multiple regions

Detected Feb 28, 2026 8:03 AM EST · Resolved Feb 28, 2026 9:33 AM EST · Duration about 2 hours

Supabase Edge Functions experienced widespread 504 errors across multiple regions for 1.5 hours due to a denial-of-service event. The incident was classified as major and affected Edge Functions' ability to process requests normally. The team identified the root cause, implemented corrective measures and mitigations to restore stability, with users confirming Edge Functions returned to normal operation.

Major February 25, 2026

February 2026: Some Users Experiencing Connectivity issues via Supavisor in EU-Central-1

Detected Feb 25, 2026 7:12 PM EST · Resolved Feb 25, 2026 8:15 PM EST · Duration about 1 hour

Supabase experienced connectivity issues with their Supavisor connection pooler in the EU-Central-1 region, while Data API, direct connections, and dedicated pooler connections remained unaffected. The incident lasted 1.1 hours, with connection and query times returning to normal levels before the team confirmed full resolution after monitoring for stability.

Minor February 25, 2026

February 2026: Delays in pausing projects and making read replica configuration changes in EU-West-1

Detected Feb 25, 2026 6:58 PM EST · Resolved Feb 25, 2026 9:27 PM EST · Duration about 2 hours

Supabase experienced delays in project pausing and read replica configuration changes in the EU-West-1 region due to a spike in queued jobs that caused processing backlogs. All existing projects remained operational and accessible throughout the incident. The issue was resolved after 2.5 hours once the job queue was processed and optimizations were implemented to improve processing speed.

Minor February 24, 2026

February 2026: Users Experiencing Network Connectivity Problems (India Region)

Detected Feb 24, 2026 9:46 AM EST · Resolved Mar 4, 2026 4:04 PM EST · Duration 8 days

Users in India experienced network connectivity problems accessing Supabase services, including Auth and Edge Functions, due to ISP-level DNS resolution issues and access restrictions by local authorities. The incident lasted over 8 days and prevented users from connecting to their Supabase projects, though the infrastructure remained fully operational and projects were accessible from outside India. The issue was resolved through engagement with the Ministry of Electronics and Information Technology (MeitY), with full access restored and users advised to clear DNS cache or use workarounds like alternative DNS providers or VPNs during the incident.

Major February 22, 2026

February 2026: Resource Metrics Collection Delays in US-West-2

Detected Feb 22, 2026 8:36 PM EST · Resolved Feb 23, 2026 3:12 AM EST · Duration about 7 hours

Supabase experienced a 6.6-hour metrics collection issue in the US-West-2 region that prevented users from viewing project metrics in the dashboard and delayed automatic functions like disk resizes. The team deployed additional capacity to restore metrics collection operations and continued monitoring until full stability was confirmed. Project availability and core functionality remained unaffected throughout the incident.