Summary AI Generated

A cooling failure at CoreWeave's US-EAST-15A data center took liquid-cooled GPU nodes in one data hall offline for approximately 14.7 hours, impacting CoreWeave Kubernetes workloads. On-site teams restored cooling relatively quickly but spent several hours verifying system stability before bringing affected racks back online in controlled batches. Nodes were progressively returned to service once cooling remained stable and hardware passed health checks.

We are investigating a cooling issue at our US-EAST-15A data center that is affecting liquid-cooled GPU nodes in one data hall. Affected nodes may be unavailable. Our data center team and vendors are on site working to restore cooling, and we don't have an estimated recovery time yet. We will provide another update within the next 30 minutes. If you have any questions, please contact us at support@coreweave.com.
Components affected
CoreWeave Kubernetes

Trusted by 1,000+ teams

The Status Page Aggregator with Early Outage Detection

Stop finding out about outages from your users. Monitor 6,320+ cloud services and get alerted the second something breaks.

IsDown status aggregator dashboard
Latest Updates ( sorted recent to last )
about 16 hours ago - at 11/26/2026 01:29PM

We are investigating a cooling issue at our US-EAST-15A data center that is affecting liquid-cooled GPU nodes in one data hall. Affected nodes may be unavailable. Our data center team and vendors are on site working to restore cooling, and we don't have an estimated recovery time yet. We will provide another update within the next 30 minutes. If you have any questions, please contact us at support@coreweave.com.

about 16 hours ago - at 11/26/2026 01:43PM

Cooling has been restored at our US-EAST-15A data center and temperatures in the affected data hall are coming down. Liquid-cooled GPU nodes in that data hall remain affected while our teams work on bringing them back. We will provide another update within the next 30 minutes.

about 14 hours ago - at 11/26/2026 04:11PM

Our on-site teams are inspecting the cooling system at our US-EAST-15A data center. Affected racks will be restarted in stages once it is confirmed stable, so GPU nodes in the affected data hall remain unavailable. We don't have an estimated recovery time yet and will provide another update within the next 30 minutes. If you have any questions, please contact us at support@coreweave.com.

about 11 hours ago - at 11/26/2026 06:46PM

Our on-site teams are continuing to inspect the cooling system at our US-EAST-15A data center. GPU nodes in the affected data hall remain unavailable. Once cooling stability is confirmed, affected racks will be restarted in stages.

We do not yet have an estimated recovery time. We’ll share another update as more information becomes available. Thank you for your continued patience. If you have any questions, please contact us at support@coreweave.com.

about 9 hours ago - at 11/26/2026 08:37PM

Our on-site teams continue their inspection and remediation work on the cooling system at our US-EAST-15A data center. GPU nodes in the affected data hall remain unavailable at this time.

We don’t yet have an estimated recovery time. We’ll provide another update as soon as more information is available. Thank you for your continued patience. If you have any questions, please contact us at support@coreweave.com.

about 7 hours ago - at 11/26/2026 11:16PM

Recovery from the earlier cooling disruption in US-EAST-15A is now underway.
Our facilities and infrastructure engineering teams are restoring power and cooling to the affected equipment in controlled batches. Before each batch is brought back online, we verify that cooling supply temperatures remain stable, then proceed to the next group.
As each batch returns and passes health checks, nodes will be returned to service. The cooling system is holding stable as load comes back, and we are moving along with node restoration.

We will continue to post updates as capacity is recovered. We apologize for the disruption and appreciate your patience.

about 6 hours ago - at 11/26/2026 11:37PM

Recovery from the earlier cooling disruption in US-EAST-15A is now underway.
Our facilities and infrastructure engineering teams are restoring power and cooling to the affected equipment in controlled batches. Before each batch is brought back online, we verify that cooling supply temperatures remain stable, then proceed to the next group.
As each batch returns and passes health checks, nodes will be returned to service. The cooling system is holding stable as load comes back, and we are moving along with node restoration.

We will continue to post updates as capacity is recovered. We apologize for the disruption and appreciate your patience.

about 4 hours ago - at 11/27/2026 01:55AM

Cooling has remained stable and some affected GPU nodes are back in service. Our engineers are continuing to restore the remaining nodes and verify that they’re ready for workloads. We apologize for the disruption and appreciate your patience.

The Status Page Aggregator with Early Outage Detection

With IsDown, you can monitor all your critical services' official status pages from one centralized dashboard and receive instant alerts the moment an outage is detected. Say goodbye to constantly checking multiple sites for updates and stay ahead of outages with IsDown.

Start free trial

No credit card required · Cancel anytime · 6320 services available

Integrations with Slack Microsoft Teams Google Chat Datadog PagerDuty Zapier Discord Webhook